A completed Fell & Marlow house seen from the street in afternoon light
00

RIBA Chartered Practice 20014455 · Sheffield

Extensions, retrofit and small commercial work in South Yorkshire.

Five people on Arundel Street. Our fees, our stages and our registration numbers are all on this website, because you should not have to ask a stranger what they charge before you know whether they are qualified.

01

Registration

Everything here is checkable. Please check it.

"Architect" is a title protected by the Architects Act 1997 — using it without registration is a criminal offence. The register is public, so a practice that gives you its numbers is handing you the means to verify it. Most do not.

ARB registration
078412 · 081337

Ruth Fell and Adam Marlow, both on the Architects Registration Board register.

Search the ARB register →
RIBA Chartered Practice
20014455

Fifteen criteria, audited annually: chartered staffing ratio, PI insurance, quality management, health & safety policy.

Find us on RIBA →
Professional indemnity
£2,000,000

Each and every claim, held continuously since 2011. Certificate sent with every fee proposal, before you sign anything.

Complaints
10 / 30 days

Acknowledged within 10 working days, answered within 30, by a named director. The written procedure is on the contact page.

Read the procedure →
02

Fees

Three ways we charge, and what each one comes to

Nobody should have to ring an architect to find out whether they can afford one. These are our 2026 rates. Which basis suits you depends on how well-defined the job is, and we will say which we think is fairer for yours.

Basis onePercentage of construction cost

9 – 13%of the build cost, full service

For a whole project, stages 1 to 6. The percentage falls as the build cost rises: 13% on a £60,000 extension, 9% on anything over £400,000. It suits work where the scope will move as the design develops, which is most of it.

Basis twoFixed fee

£1,850 – £6,400by scope, quoted before we start

Site appraisal and feasibility £850. Planning drawings £1,850 – £3,200. Planning plus Building Regulations £3,400 – £6,400. Best where the job is well-defined and you want the number fixed. Council application fees are separate and go straight to them.

Basis threeTime charge

£95 / hrdirector · £65 assistant

For early advice, planning appeals, party wall matters and anything genuinely open-ended. Recorded in 15-minute units, reported monthly, and we will tell you when a time charge is about to become worse value than a fixed fee.

Worked example · rear extension, £96,000 build cost

Stages 1 – 3, to planning permission£4,600
Stage 4, Building Regulations & tender package£3,100
Stages 5 – 6, site administration to completion£2,900
VAT at 20%£2,120
Total payable to us£12,720

That is 11% of the build cost, plus VAT — the middle of our range for a project this size. Separately, and not to us: planning application £258, Building Regulations approx. £750, structural engineer £900 – £1,400.

03

RIBA Plan of Work 2020

Eight stages, and where the money actually sits

Every architect in the country writes their fee proposal against these stages. Almost none of them draws you the shape of it. The divisions below are sized by fee share — Stage 4 is the wide one because technical design is where the work is.

RIBA PLAN OF WORK 2020 · FEE SHARE BY STAGE 0 1 2 3 4 5 6 7 0% 8% 15% 20% 27% 20% 6% 4% most domestic clients stop here

0–1

Strategic definition & briefing

We measure the building, look at what the planners have said to your neighbours, and tell you whether the thing you want is the thing you need. Occasionally we tell people not to build.

Fee share 8%2–4 weeksStage 0 is free

2

Concept design

Plans, sections and massing, at 1:100 and 1:50. Two or three options, priced roughly, so the conversation is about which one rather than whether.

Fee share 15%4–6 weeks

3

Spatial coordination & planning

The design resolved and submitted. Determination is 8 weeks by statute for a householder application — that clock belongs to the council, not to us, and we will not pretend otherwise.

Fee share 20%6 weeks + 8 to determine

Most domestic clients stop here — stages 0–3 are roughly 43% of the full fee. You can take the permission and go elsewhere for the rest. We will hand over the files without being difficult about it.

4

Technical design

Building Regulations package, construction details at 1:20 and 1:5, specification, and the drawings a builder can actually price. The widest division on the bar, because this is where a picture becomes a building.

Fee share 27%6–10 weeksStructural engineer appointed

5–6

Construction & handover

Contract administration, site inspections at agreed stages, valuations, and the snagging list nobody enjoys. We are appointed Principal Designer under CDM 2015 on most domestic projects, which is a statutory role rather than a courtesy.

Fee share 26%4–9 months on site

7

In use

A visit at eleven months, before the defects period closes, to write the list while it is still the contractor's problem rather than yours.

Fee share 4%At 11 months

04

Deliverables

What lands in your inbox, and at what scale

A drawing register from a real Stage 3 submission. This is the whole of what "planning drawings" means — no more, and no less.

Location planRed-line boundary, as the council requires

FM-001 · 1:1250

Site planExisting and proposed, with levels

FM-002 · 1:200

Existing plansEvery floor, measured on site

FM-100–104 · 1:50

Existing elevations & sectionAll four faces, one cut

FM-110–114 · 1:50

Proposed plansEvery floor, with the new work shown red

FM-200–203 · 1:50

Proposed elevations & sectionIncluding the street scene with neighbours

FM-210–214 · 1:50

Design & Access StatementWhere the site is in a conservation area

FM-DAS · —

The application itselfSubmitted, monitored and answered by us

Planning Portal

05

Selected projects

Three, with the facts a photograph leaves out

Wardsend Terrace — a red brick Victorian terrace on a quiet Sheffield street

Wardsend Terrace

Sheffield S6 · rear extension and fabric retrofit

A two-up two-down opened at the back, with the party wall insulated and the solid walls lined internally. The clients had been quoted for a conservatory; we talked them out of it and into 42 m² that holds its heat.

Construction value
£96,000
Floor area added
42 m²
Consent
Householder, granted
Stages undertaken
0–7
Contractor
Hartop & Sons
Completed
March 2025
Nether Edge — the reworked ground floor, looking back through the opening

Nether Edge

Sheffield S7 · whole-house retrofit, conservation area

A late-Victorian villa taken back to brick internally and rebuilt to an EnerPhit-informed standard. Airtightness came in at 1.6 ach@50Pa, which is not certified Passivhaus and we do not claim it is.

Construction value
£184,000
Floor area (GIA)
158 m²
Consent
Conservation area, granted
Stages undertaken
0–4
Airtightness
1.6 ach@50Pa
Completed
November 2024
Arundel Works — the stone elevation of a small commercial conversion

Arundel Works

Sheffield S1 · workshop to studios, change of use

A cutlery works divided into eleven studios and a shared yard. Class E change of use, a new stair core, and as little done to the stone as we could get away with.

Construction value
£310,000
Floor area (GIA)
240 m²
Consent
Change of use, Class E
Stages undertaken
0–7
Contractor
Loxley Build Ltd
Completed
June 2025
06

Clients

What people said afterwards

"We had three quotes and Fell & Marlow were not the cheapest. They were the only ones who told us before we appointed them what the whole thing would cost, including the bits that were not theirs."
Wardsend Terrace · March 2025
"Ruth talked us out of the loft conversion at the first meeting and did not charge us for the meeting. Two years later we came back with a better project and a bigger budget."
Nether Edge · November 2024
"Planning took eleven weeks rather than eight and Adam rang us in week nine to say so, unprompted. That is the whole of why we used them again on the second building."
Arundel Works · June 2025
07

First conversation

An hour, at your house, at no charge

We walk round, you tell us what is wrong with the house, and we tell you honestly whether it is worth doing and roughly what it costs. If we are not the right practice we will say so, and usually name someone who is.