01Commercial main contractor
We raise the frame. We keep the date.
Offices, logistics, healthcare, education and technical buildings. Two-stage and design & build, delivered by directly employed teams — with a safety record we will put in the tender.

- 1978
- Founded in Sheffield
- £410m
- Turnover, last year
- 0.16
- AFR, trailing 12 months
- 840
- People, directly employed

03Services
How we are bought
- 01Design & buildOne contract for the drawing and the building.Typically £8–90m
- 02Two-stage tenderA first-stage price you can interrogate.Typically £15–120m
- 03Pre-constructionLogistics, buildability and a cost plan a board can use.Six to twenty weeks
- 04Occupied & refurbishmentLive hospitals, trading floors, open campuses.Typically £4–60m
- 05Logistics & industrialSheds, slabs and yards, without the drama.20,000–80,000 m²
- 06Healthcare, education & technicalCoordination-heavy buildings. No appetite for surprise.Typically £20–120m
04Live programme
On site now
Three jobs in progress. Weeks are construction weeks, not a marketing countdown.
- Aldgate Clinical Wing
41of 78 weeks
Whitechapel · Envelope · Week 41 of 78
- Meridian Hall
12of 64 weeks
Slough · Substructure · Week 12 of 64
Cutlers Yard fit-out
6of 28 weeks
Sheffield · Strip-out · Week 6 of 28
05Accreditations
Certified, and current.
ISO 9001, 14001, 45001 and 19650. Constructionline Gold, CHAS Elite, Achilles, Considerate Constructors, FORS Gold, Cyber Essentials Plus.
- ISO 9001Quality managementSince 1998
- ISO 14001Environmental managementSince 2004
- ISO 45001Occupational health & safetySince 2019
- ISO 19650BIM information managementSince 2021
06Tender desk
Send the brief. We will answer with a route.
Tell us the sector, the value band and whether the building is live. Pre-construction replies inside two working days on a real appointment — this preview keeps the enquiry on your device.



