Manchester electricians since 1987 · NICEIC · Part P

Office 0161 496 220024-hour 0800 772 7514

  1. Home
  2. Our work

Gallery

Before, after, and the jobs in between.

Slide an old board into its replacement, then browse six Manchester jobs. The photographs are free-licence images of the same kind of work — see the note under each.

Before and after

The board, not a filter.

Drawn from the boards we still pull out of pre-1970 terraces, and the metal units that replace them.

A 1960s wooden distribution board holding a mix of old fuses and early breakers
Before
A row of grey circuit breakers with printed circuit labels in a modern board
After
BeforeAfter

Illustrative photos: an old fuse board and a modern row of breakers. Slide, or use the arrow keys.

Project portfolio

Recent work, named by place.

  • A DIN rail of breakers with coloured wiring fitted against a blue wall
    Illustrative photo

    Consumer unit · 1 day

    Didsbury board swap

    Plastic rewirable out. Metal RCBO board in. SPD fitted on a TT supply.

  • Bundles of grey network cable laid in a ceiling cable tray, seen from below
    Illustrative photo

    Partial rewire · 6 days

    Ancoats warehouse

    Three floors of a mill conversion. Lighting kept live for the residents downstairs.

  • A wall charger with a green status light mounted beside a window in a garage
    Illustrative photo

    EV · half day

    Sale driveway charger

    Load curtailment because the shower and the hob already owned the supply.

  • A bare filament bulb under a white enamel pendant shade in front of shelves of bottles
    Illustrative photo

    Lighting · 3 nights

    Northern Quarter bar

    Tracks and emergency fittings after close. No daytime shutdown.

  • A green digital multimeter with red and black probes in an open carry case
    Illustrative photo

    EICR · morning

    Hulme landlord pack

    Report, photos, and a separate remedials quote the agent could forward.

  • Cable ladders carrying cables along a concrete ceiling
    Illustrative photo

    Small power · 4 days

    Salford Quays office

    Floor boxes, a new board, and as-fitted drawings for the landlord.

On call

Inner boroughs, day and night.

Office 8–5, Monday to Friday. The emergency line answers after that.

Get a quote